Richardson International’s North Vancouver facility is one of the most successful grain handling facilities in the world, exporting on average, nea
LNS was awarded the design-build contract to replace the drive motors on the Burrard Inlet Railway Bridge.
LNS was awarded the design-build contract to replace the Lulu Island Swing Bridge Slew Motor.
The headbox of Kinder Morgan’s 564 Conveyor was experiencing high impact from the material stream that caused premature wear through the liners and
Westshore Terminals Ltd. contracted LNS to design and build a complete coal sampling system for their Berth 1 ship loading facility. LNS was respo
Westshore Terminals Ltd. contracted LNS to replace their existing primary coal sampler located on Berth 2. LNS installed a new falling stream samp
Lehigh Hanson Materials turned to LNS to design, build, install and commission a new conveying system on their Evco 100 barge to replace an outdate
Agrium and Neptune Bulk Terminals contracted LNS to design and build a complete phosphate rock terminal facility.
Weyerhaeuser Princeton Division contracted LNS to design, supply and install a new log processing system for short logs.